Page 1 of 3 |
|
|
Procedure Number:
QPRO4.2 |
Revision: |
|
Subject: Document
Control General |
Effective Date: |
|
|
Approved By: Signature on file |
Changes?
Introduction:
This Procedure is
intended to provide general guidelines for
the control of
documents that support the Quality Management System. Control
of documents
includes:
a) Proper approval of
the document
b) Proper methods for
modification and changes
c) Issuing,
distributing, and replacing the document
Definitions:
Record
Scope: Quality
System related documentation in use at corporate GR.
Procedure:
1.0
Control at the point of issue
1.2
Responsibility: Issuer/Issuing Department as depicted in matrix exhibit
D
1.3
All Quality System related documents shall be reviewed for adequacy and
approved
by appropriate personnel prior to issue.
operations
essential to the effective operation of Quality System are performed.
The
method of control shall be sufficient to demonstrate knowledge of the
location,
and revision level of controlled copies at all times. Distribution is indicated
in the matrix exhibit D at the bottom of this procedure.
Documents
used for information, correspondence, or other uncontrolled
use
shall be clearly marked with the following statement:
THIS COPY IS NOT SUBJECT
TO REVISION CONTROL
VERIFY REVISION STATUS OF
DOCUMENT BEFORE USING.
For electronically
formatted documents, the word uncontrolled may be
used in lieu of the
statement above.
All superseded or
obsolete controlled documents shall be removed from
points of issue or
shall be segregated from current controlled documents at the
point of issue.
2.0 Control at the point of use
2.1
Responsibility: Document
Recipient
2.2
All recipients of controlled documents
shall be responsible for the storage
and
maintenance of the documents, and shall inform all personnel whose
activities
are affected by the document of its content and location.
Upon
duplication of a controlled document, the duplicator assumes the
point
of issue responsibilities outlined in section 1.0 of this procedure with the
exception of review and approval.
All
superseded or obsolete documents shall be removed from points of
use
or be segregated from current revisions at points of use.
3.0 Document Changes
3.1 Responsibility: Issuer/Issuing
Department as depicted in matrix exhibit D
3.2 All controlled document changes or
revisions will be performed at the
original
point of issue, and shall be reviewed and approved as outlined in
section
1.0 of this procedure.
A master list or
equivalent, of current revision level of documents shall be
maintained by the
responsible departments as depicted in matrix exhibit D.
Exhibit D:
|
Document |
Issuing Department |
System of Master |
Distribution |
|
|
Drawings |
Engineering |
P:\CAD\ |
Quality, Purchasing and Manufacturing |
|
|
Bill of Materials |
Engineering |
MRP System |
MRP System |
|
|
Material Specs. |
Engineering |
P:\Eng\Speclist.doc |
Quality |
|
|
Quality Policies |
Quality Assurance |
Intranet |
Intranet |
|
|
Quality Procedures |
Quality Assurance |
Intranet |
Intranet |
|
|
Quality Forms |
Quality Assurance |
Intranet |
Intranet |
|
|
Quality Work Instructions |
Quality Assurance |
Intranet |
Intranet |
|
|
ECNs |
Engineering |
P:\CAD\ |
Quality, Purchasing and Manufacturing |
|
|
Customer Dwg. |
Engineering |
Customer Files |
Engineering Only |
|
|
Customer Specs. |
Engineering |
Customer Files |
Engineering Only |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Records: NA